Wujiang Waste Power Generation Project is designed to deal with 1,500 tons of garbage per day. It is the national AAA level domestic waste incineration plant and the Jiangsu AAA level domestic waste incineration plant. This project is the first garbage power generation project based on the mode of "demolishing the old and building the new". The first large-scale 750-ton/day incinerator independently developed has filled the gap of domestic large-capacity domestic garbage incineration equipment.

Wujiang Guangda Waste Incineration Power Generation Project